Chemical Processing Building

Scope of Work: BIM Solutions was subcontracted as the BIM lead to coordinate the HVAC Piping, Ductwork and Plumbing systems for both buildings. 

HVAC System Description: The building is conditioned by 5 chilled water, heating water and steam air handling units. 

Plumbing System Description: The chemical tanks are supplied and drained by different treated water systems.

Project Facts

  • This project is comprised of an industrial project where chemicals are created and tested. An existing building was renovated and expanded to accommodate the new research area.
  • Included Systems:

    • HHW S/R Piping
    • CHW S/R Piping
    • Steam Piping
    • Condensate Piping
    • Medium and Low Pressure Supply, Return, Exhaust Ductwork
    • Plumbing Gravity
    • Storm Drain and Overflow Storm Drain
    • Plumbing Pressure Piping
    • Deionized Water
    • Compressed Air